Previous Page   Next Page
| Folder | Folder Hidden | Folder Type | Description | Folder Key | Last Updated | Folder Id |
| Alternate Bill of Materials / Routing Codes | Visible | Simple | This shows codes(designators) which can be used to define alternate routings and bills of material for items. | ENI_BOM_ALTERNATE_BOMROUTING_CODES | 29-Sep-2006 | 101356 |
| Bill Of Materials | Visible | Simple | This show the product assembly structure. The structure classifies bills as manufacturing or engineering and show how lower level components are assembled in an hierarchical structure. | ENI_BOM_BILL_OF_MATERIALS | 28-Sep-2006 | 101357 |
| Bill of Materials Components | Visible | Simple | This shows individual item components in a engineering or manufacturing bill of material. | ENI_BOM_BOM_COMPONENTS | 28-Sep-2006 | 101358 |
| Bill of Materials Reference Designators | Visible | Simple | This shows Information about reference designators associated with a bill of material component. | ENI_BOM_BOM_REFERENCE_DESIGNATORS | 28-Sep-2006 | 101359 |
| Bill of Materials Revisions | Visible | Simple | This shows the revision level of a bill of materials. | ENI_BOM_BOM_REVISIONS | 28-Sep-2006 | 101360 |
| ECO Priorities | Visible | Simple | This shows the engineering change priority that users enter when defining engineering change orders(ECOs). | ENI_ENG_ECO_PRIORITIES | 29-Sep-2006 | 101387 |
| ECO Revised Components | Visible | Simple | This shows a component on an ECO which is either being added, deleted or undergoing a revision change. | ENI_BOM_ECO_REVISED_COMPONENTS | 28-Sep-2006 | 101361 |
| ECO Revised Items | Visible | Simple | This shows information about the revised items on an engineering | ENI_ENG_ECO_REVISED_ITEMS | 28-Sep-2006 | 101388 |
| ECO Revisions | Visible | Simple | This shows the revision levels of a Engineering Change Order(ECO). | ENI_ENG_ECO_REVISIONS | 29-Sep-2006 | 101389 |
| ECO Workflow Process Selection Rules | Visible | Simple | This shows the engineering change type processes that you use to associate with ECOs. | ENI_ENG_ECO_WORKFLOW_PROCESS_SELECTION_RULES | 29-Sep-2006 | 101390 |
| Engineering Bill of Materials | Visible | Simple | This shows bills of material for a component in an engineering or prototype environment. | ENI_BOM_ENGINEERING_BOMS | 28-Sep-2006 | 101362 |
| Engineering Change Approval Lists | Visible | Simple | This shows lists of individuals(employees) who are authorized to approve a engineering change order(ECO) during a ECO implementation cycle. | ENI_ENG_ENGINEERING_CHANGE_APPROVAL_LISTS | 29-Sep-2006 | 101391 |
| Engineering Change Approvers | Visible | Simple | This shows employees who are authorized to approve a ECO. These employees are assgined to a engineering change order approval list. | ENI_ENG_ENGINEERING_CHANGE_APPROVERS | 29-Sep-2006 | 101392 |
| Engineering Change Orders | Visible | Simple | This shows the information about controlling and requesting a change to an existing product or product under development which will change the product revision. | ENI_ENG_ENGINEERING_CHANGE_ORDERS | 28-Sep-2006 | 101393 |
| Engineering Change Reasons | Visible | Simple | This shows the reason for the requested engineering change to the product. | ENI_ENG_ENGINEERING_CHANGE_REASONS | 29-Sep-2006 | 101394 |
| Engineering Change Types | Visible | Simple | This shows information about engineering change order type. | ENI_ENG_ENGINEERING_CHANGE_TYPES | 28-Sep-2006 | 101395 |
| Flow Routing Events | Visible | Simple | This shows information about events, yields and cycle times for a product which is to be manufactured using flow manufacturing concept. | ENI_BOM_FLOW_ROUTING_EVENTS | 28-Sep-2006 | 101364 |
| Flow Routing Line Operations | Visible | Simple | This shows information about line operations, yields and cycle times for a product which is to be manufactured using flow manufacturing. | ENI_BOM_FLOW_RTG_LINE_OPERATIONS | 28-Sep-2006 | 101366 |
| Flow Routing Processes | Visible | Simple | This shows information about processes, yields and cycle times for a product which is to be manufactured using flow manufacturing. | ENI_BOM_FLOW_ROUTING_PROCESSES | 28-Sep-2006 | 101365 |
| Flow Routings | Visible | Simple | This shows information about processes, events, routing networks, line operations, yields and cycle times for a product which is to be manufactured using flow manufacturing. | ENI_BOM_FLOW_ROUTINGS | 28-Sep-2006 | 101363 |
| Internal Manufacturing Resources | Visible | Simple | This shows information about manufacturing resources that are considered part of an internal organization. | ENI_BOM_INTERNAL_MFG_RESOURCES | 28-Sep-2006 | 101367 |
| Manufacturing Operations | Visible | Simple | This shows information about routing operations. Users may define multiple operations for a routing. | ENI_BOM_MFG_OPERATIONS | 28-Sep-2006 | 101372 |
| Manufacturing Resource Shifts | Visible | Simple | This shows information about shifts that users assign to a resource. If the resource is not a 24-hour resource, users can assign multiple shifts to the resource. | ENI_BOM_MFG_RESOURCE_SHIFTS | 29-Sep-2006 | 101373 |
| Manufacturing Shift Modifications | Visible | Simple | This shows information about capacity modifications for a resource on a shift in a department. Users can make multiple resource modifications for a shift. | ENI_BOM_MFG_SHIFT_MODIFICATIONS | 28-Sep-2006 | 101374 |
| Manufacturing Standard Operations | Visible | Simple | This shows information about the standard activity or set of activities used to manufacture a product. | ENI_BOM_MFG_STANDARD_OPERATIONS | 28-Sep-2006 | 101375 |
| Manufacturing Activities | Visible | Simple | This shows information about manufacturing activities that are either organization specific or common to all organizations. | OPI_CST_MANUFACTURING_ACTIVITIES | 28-Sep-2006 | 102291 |
| Manufacturing Bill of Materials | Visible | Simple | This shows information about bills of material for an item in a production or manufacturing environment. | ENI_BOM_MANUFACTURING_BOMS | 28-Sep-2006 | 101368 |
| Manufacturing Department Classes | Visible | Simple | This shows the classification of departments related to manufacturing. | ENI_BOM_MFG_DEPARTMENT_CLASSES | 29-Sep-2006 | 101370 |
| Manufacturing Department Resources | Visible | Simple | This shows the resources assigned to a department which can be used on routing operations. | ENI_BOM_MFG_DEPARTMENT_RESOURCES | 28-Sep-2006 | 101371 |
| Manufacturing Departments | Visible | Simple | This shows information about the area within an organization that controls manufacturing operations. | ENI_BOM_MFG_DEPARTMENTS | 29-Sep-2006 | 101369 |
| Operation Networks | Visible | Simple | This shows information about the network of processes or operations and the order they need to be performed to manufacture a product. | ENI_BOM_OPERATION_NETWORKS | 28-Sep-2006 | 101376 |
| Organization Items | Visible | Simple | This shows definitions for inventory items, engineering items, and purchasing items in the master organization. | ENI_INV_ORGANIZATION_ITEMS | 28-Sep-2006 | 101413 |
| Outside Operation Resources | Visible | Simple | This shows information about resource used in an operation that is performed outside of an organization. | ENI_BOM_OUTSIDE_OPERATION_RESOURCES | 28-Sep-2006 | 101377 |
| Routing Operation Resources | Visible | Simple | This shows information about resources used by an operation which is listed in at least one routing step used to build an assembly. | ENI_BOM_ROUTING_OPERATION_RESOURCES | 28-Sep-2006 | 101379 |
| Routing Revisions | Visible | Simple | This shows information about the revision levels of routings. When a routing is defined, a revision must be entered, so that every routing has at least one valid revision. | ENI_BOM_ROUTING_REVISIONS | 28-Sep-2006 | 101380 |
| Routings | Visible | Simple | This shows information about the sequence of manufacturing operations that are performed to manufacture an assembly. | ENI_BOM_ROUTINGS | 28-Sep-2006 | 101378 |
| Standard Flow Routing Operations | Visible | Simple | This shows information about basic granular tasks within processes, events and line operations that define physical activities on a manufacturing line. | ENI_BOM_STANDARD_FLOW_ROUTING_OPERATIONS | 28-Sep-2006 | 101381 |
| Standard Operation Resources | Visible | Simple | This shows information about resources which are used by a basic or typical operationthat is included in at least one routing step used to build an assembly. | ENI_BOM_STANDARD_OPERATION_RESOURCES | 28-Sep-2006 | 101382 |
| Standard Routing Operations | Visible | Simple | This shows information about a standard activity or set of activities which are used to manufacture a product without using flow manufacturing. | ENI_BOM_STANDARD_ROUTING_OPERATIONS | 28-Sep-2006 | 101383 |
| Substitute Bill of Materials Components | Visible | Simple | This shows information about component items that may be substituted for another component item on a particular bill of materials. | ENI_BOM_SUBSTITUTE_BOM_COMPONENTS | 28-Sep-2006 | 101384 |
| Work Order Routing Operations | Visible | Simple | This shows information about routing operations which are not events, processes or line operations for flow manufacturing. | ENI_BOM_WORK_ORDER_ROUTING_OPERATIONS | 28-Sep-2006 | 101386 |
| Work Order Routings | Visible | Simple | This shows information about a sequence of non-flow manufacturing operations that are performed to manufacture an assembly. | ENI_BOM_WORK_ORDER_ROUTINGS | 28-Sep-2006 | 101385 |
| Workflow Processes | Visible | Simple | This shows selection rules used to route the ECO through a workflow process. | ENI_ENG_WORKFLOW_PROCESSES | 29-Sep-2006 | 101396 |